有些时候物料期间已经关了,但是当我们要对往期的帐期进行结算时,会报错误,错误如下

计算出前一期间中物料 46的期末结算消息号 C+805
诊断您想执行含有评估范围SAPA中评估类型的物料46的单级价格确定。您已经输入了需要确定价格的期间,但是还没有完成上一期间中物料的期末结算。上一期间中物料状态是已确定价格(单层)。
价格确定标识3需要您执行每一期间和相关清算条目的单级价格确定(和可能的多级价格确定)。即使没有输入物料任何数据,这也是必要的。
系统响应系统不允许特定物料的单级价格确定。
步骤在进行前,您必须执行单级价格确定(和可能的多级)和上一期间的清算条目。




查了下NOTE,解决方案如下:
Symptom
You are unable to carry out any period-end closing operations for the penultimate period in the material ledger after the period shift in Materials Management (Transaction: MMPV).
Example:
In plant 1000, you shift the period to 10/2000. You are now only able to carry out period-end closing operations for period 9 in the material ledger. Period-end closing operations are now no longer possible for period 8 and lower.
Single-level price determination
If you want to carry out a single-level price determination for 8/2000, the system issues error message:
C+712:
"You cannot perform price determination in period 008/2000".
or
C+805:
"Carry out period-end closing for material &1 &2 in the previous period".
Multi-level price determination
If you want to carry out a multi-level price determination for 8/2000, the system issues error message:
CKMLMV008:
"You cannot perform price determination in period 8/2000".
Closing entry
If you want to execute a closing entry for 8/2000, the system issues error message:
C+715
"You are not allowed to execute closing entries in period 8/2000"
Revaluation of single-level consumption:
As of Release Enterprise, Financial Extensions 1.10, the step 'Revaluation of single-level consumption' is integrated in the cost estimate cockpit. If you carry out a revaluation of single-level consumption for 8/2000, the system issues error message:
CKMLVNB050:
"You can not revaluate consumption on periods 8/2000"
WIP-revaluation:
As of Release Enterprise, Financial Extensions 2.00, the 'WIP revaluation' step is integrated into the cost estimate cockpit. If you carry out a WIP revaluation for 8/2000, the system issues error message:
CKMLWIP050
"WIP revaluation is not allowed for periods 003/2003 plant &"
Other terms
CKMLCP, CKMI, CKMH, CKMM_RUN, MMPV, CKMLVNB050, CKMLVNB-050 CKMLWIP050, CKMLWIP-050, C+722
Reason and Prerequisites
You use the material ledger.
Materials Management does not allow postings to be made to other periods than the current period and the previous period. The closing entry for the actual costing is a posting for the material and therefore is not intended for periods that are older than the previous period.
Solution
If you use the actual costing (material ledger), you must have completely closed all period-end closing operations in the actual costing for the penultimate period prior to the period shift. Use the 'Costing Cockpit' (Transaction CKMLCP) to make sure that all the materials of the run have status 'Closing entry performed'.
The processing of older periods is not supported in the standard system. Particularly in test systems, however, sometimes the period has been shifted once without all of the period-end closing operations of the penultimate period having been successfully carried out beforehand.
You can still carry out period-end closing operations in the previous periods using the following workaround.
Single-level price determination:
==> Call up Transaction CKMLCP.
==> Select the costing run and the period for which you want to carry out the period-end closing operation.
==> Go to the 'Change parameters' screen for the single-level price determination.
==>Enter "MUST_SETTLE" in the OK code (Transaction code field).
==> Choose ENTER.
==> A single-level price determination is carried out for the run.
Multi-level price determination:
==> Call up Transaction CKMLCP.
==> Select the costing run and the period for which you want to carry out the period-end closing operation.
==> Go to the 'Change parameters' screen for the multi-level price determination.
==>Enter "MUST_MULTI" in the OK code (Transaction code field).
==> Choose ENTER.
==> A multi-level price determination is carried out for the run afterwards.
Revaluation of single-level consumption (as of Release Enterprise)
==> Call up Transaction CKMLCP.
==> Select the costing run and the period for which you want to carry out the period-end closing operation.
==> Go to the 'Change parameters' screen for the revaluation of single-level consumption.
==>Enter "MUST_COGS" in the OK code (Transaction code field).
==> A revaluation of single-level consumption is carried out for the run afterwards.
WIP revaluation (as of Release Enterprise, Ext.Set 2.00)
==> Call up Transaction CKMLCP.
==> Select the costing run and the period for which you want to carry out the period-end closing operation.
==> Go to the 'Change parameters' screen for the WIP revaluation.
==>Enter "MUST_WIP" in the OK code (Transaction code field).
==> A WIP revaluation is carried out for the run afterwards.
Closing entry
==> Call up Transaction CKMLCP.
==> Select the costing run and the period for which you want to carry out the period-end closing operation.
==> Go to the 'Change parameters' screen for the closing entry.
==>Enter "MUST_CLOSE" in the OK code (Transaction code field).
==> A closing entry is carried out for the run afterwards.
Reversing closing entry
==> Call up Transaction CKMLCP.
==> Select the costing run and the period for which you want to carry out the period-end closing operation.
==> Go to the 'Change parameters' screen for the closing entry.
==> Choose 'Reverse'.
==>Enter "MUST_REVERSE" in the OK code (Transaction code field).
==> The closing entry is reversed afterwards.


CAUTION: This is a workaround for a function that is not supported. You take full responsibility for using the workaround and SAP does not provide any support in this case. SAP will not be responsible for the data integrity if you have carried out period-end closing operations of the material ledger for other periods than for the previous period.
If problems arise when you apply the workaround, SAP can only provide help in the form of chargeable consulting.

If you use the actual cost component split, the workaround is only possible for the periods as of the actual cost component split start period as well as their prior period.

The following analysis procedure is recommended before applying the workaround:
  • Start Transaction CKM3 beginning from the current period into the past up to the last period record that has the closing entry status (70) or created status (01). If no period has this status, all periods are to be closed.
  • The period following this period (status 10 to 60) is the first period to be to closed using the workaround.
  • Then the subsequent periods are to be closed.

If you execute a MUST_XXX transaction, the system might display error message C+722 ("No data is avaliable for material & in period &."). With the selection, all materials with price determination control 3 that exist at the current time are entered. However, in the period that you want to edit with a MUST_XXX operation these materials might not have existed yet. Or they have not yet existed in the subsequent period which is posted to at the period-end closing. In this case, error C+722 occurs. As it would not make any sense to determine the price or post the period-end closing for a material that does not exist, you can ignore this error

最近访客

  • 青青子衿
    2022-07-28
  • ma991221
    2020-12-05
  • AllIsWel
    2020-11-15




上一篇:赛跑网原创-第十期KICK OFF视频
下一篇:FICO上线的数据整理
本楼点评(0) 收起
发表于 2013-12-27 11:24:22 | 显示全部楼层
关注一下~~~慢慢研读·~~~
本楼点评(0) 收起
发表于 2013-12-29 09:24:53 | 显示全部楼层
回帖是种美德.
本楼点评(0) 收起
您需要登录后才可以回帖 登录 | 注册

本版积分规则

小黑屋|联系我们|赛跑网 ( QQ:108519493QQfsq

GMT+8, 2024-4-27 20:27 , Processed in 0.240989 second(s), 41 queries .

Powered by 91SAP X3.4

© 2001-2023 91sap Team.

快速回复 返回顶部 返回列表